Ukraine determines the specifics of connecting floating power plants to the grid.


The National Commission for State Regulation of Energy and Utilities (NKREKP) has established the rules for connecting floating power plants to the energy system during martial law.
This decision was made at the commission's meeting, reports Ukrinform.
NEC "Ukrenergo" must provide information on the maximum power level that the networks will be able to provide for floating power plants by October 25.
In the case of connecting floating power plants during martial law, NEC "Ukrenergo" may issue permission without obtaining a connection service.
Owners of floating power plants will temporarily not need to install separate electricity metering devices for the electricity they generate or consume. They must ensure the commercial accounting of electricity for external networks for each commercial metering point.
According to the calculations of NEC "Ukrenergo", floating power plants can additionally provide networks with 250 MW of power.
Read also
- The intelligence service announced the start of the exchange of bodies of the deceased between Ukraine and the Russian Federation
- The Russians are trying to create a foothold for an offensive on Kostiantynivka
- The enemy has changed tactics in attacks in the Kupiansk direction
- Russians are trying to bypass Lyman and capture key heights
- An attack occurred at the factory in Kazan that produced charges for 'Kalibr' and 'Iskander': video
- Ukrainian Armed Forces strike Russian aircraft at Savasleyka airfield: what is known